Slab Addition Quotes

Get Professional Services

Cost of Slab Addition Service in Suwanee

Adding a slab to your property in Suwanee, GA, can be an excellent investment, whether you're looking to build a new patio, extend your driveway, or lay the foundation for a new structure. Understanding the costs involved can help you budget effectively and ensure your project runs smoothly. Below, we break down the factors that influence the cost and provide a table of common tasks and their average costs.

Factors Affecting Cost

  • Size of the Slab: Larger slabs require more materials and labor.
  • Thickness: Thicker slabs are more durable but also more expensive.
  • Type of Concrete: High-strength or decorative concrete can increase costs.
  • Site Preparation: Grading, excavation, and removal of debris can add to the overall expense.
  • Labor Costs: Labor rates can vary based on the complexity of the job and the experience level of the workers.
  • Permits and Inspections: Local regulations may require permits and inspections, adding to the cost.
  • Additional Features: Features like reinforcement, drainage systems, and finishing touches can increase the price.

Average Costs for Common Tasks

Task Average Cost (Suwanee, GA)
Basic Concrete Slab (per sq ft) $5 - $8
Reinforced Concrete Slab (per sq ft) $7 - $10
Site Preparation (per hour) $50 - $70
Excavation (per cubic yard) $100 - $150
Concrete Pumping (per hour) $150 - $200
Finishing and Sealing (per sq ft) $2 - $4
Permit Fees $50 - $300
Inspection Fees $100 - $200

Understanding these factors and costs can help you plan your slab addition project in Suwanee, GA, with greater confidence.

Slab Addition Service